Updated 26 Aug 2026 · 341 activities · 2026-01-01 to 2026-08-24

Busselton Command Centre

Status: RED
Days to Busselton10206 Dec 2026
Last 7 days0.5hours · prior 7: 12.1
Season volume421hours · 341 activities
Load sourcedurationno power/pace ingested

Weekly volume by discipline

Moving time, duplicate uploads removed. Hover any block for the week's detail.

SwimBikeRunStrength
0510152029/1212/0126/0109/0223/0209/0323/0306/0420/0404/0518/0501/0615/0629/0613/0727/0710/0824/08stopped →
Show weekly table
WeekSwim hBike hRun hStr hTotal hRun kmBike kmSwim km
2025-12-290.45.41.10.06.912.81831.5
2026-01-051.57.21.40.010.117.82375.8
2026-01-121.111.52.00.615.323.43694.3
2026-01-190.49.22.10.612.325.72801.5
2026-01-260.76.62.10.610.025.52162.5
2026-02-022.18.92.71.214.931.72747.7
2026-02-093.17.12.10.813.225.222511.3
2026-02-162.56.33.20.012.038.120110.5
2026-02-232.19.03.50.314.943.42828.1
2026-03-022.48.72.20.013.225.72559.2
2026-03-092.57.53.00.012.936.52299.7
2026-03-162.58.73.20.014.438.52469.6
2026-03-231.75.91.70.09.320.01716.5
2026-03-301.76.33.00.011.038.41866.3
2026-04-063.27.14.20.014.553.624311.7
2026-04-132.48.13.00.914.338.92849.0
2026-04-202.66.53.90.013.051.31929.5
2026-04-272.17.82.40.212.432.32357.9
2026-05-042.15.52.00.09.622.21857.9
2026-05-113.77.73.30.014.742.027013.8
2026-05-183.17.94.30.015.354.227211.8
2026-05-252.97.23.10.013.239.323611.0
2026-06-011.77.94.50.014.158.02466.4
2026-06-081.83.84.70.010.463.2867.2
2026-06-152.26.81.70.010.820.22028.5
2026-06-222.65.72.80.011.236.318610.1
2026-06-292.67.83.70.014.144.225310.1
2026-07-062.09.92.90.014.935.22978.0
2026-07-132.58.72.20.013.427.024110.0
2026-07-202.77.11.50.011.317.921110.5
2026-07-272.210.72.90.015.834.62928.3
2026-08-032.76.73.90.013.345.723310.5
2026-08-101.87.83.30.012.941.32377.0
2026-08-170.01.00.50.01.55.500.0
2026-08-240.00.50.00.00.50.0170.0

Measured — moving time as recorded by the device.

Performance management chart

CTL, ATL and TSB require a training-load score for every day.

TSS not available for this datasetNo per-activity power or pace streams have been ingested, so no load score exists to accumulate. Connect intervals.icu (which already computes TSS) or run a stream backfill.

Acute : chronic ratio — on duration

7-day mean daily load over the 28-day mean. Shaded band is 0.8–1.3; above 1.5 is the flagged danger zone. Both the classic rolling ratio and the EWMA variant are shown, because the rolling form has known methodological criticisms and disagreement between them is itself a signal.

RollingEWMA
0.00.51.01.50.050.2201/0124/0116/0211/0303/0426/0419/0511/0604/0727/0719/08

Computed on duration. Duration answers ‘more hours than usual’, not ‘more work’ — it cannot see intensity.

ACWR now0.05sweet spot 0.8–1.3
Monotony0.417-day mean ÷ SD
Strain0weekly load × monotony

Swim volume by week

Hours per week, with distance and session count in the tooltip.

0123429/1212/0126/0109/0223/0209/0323/0306/0420/0404/0518/0501/0615/0629/0613/0727/0710/08

Measured.

Swim performance management chart

Needs a per-activity load score.

No TSS for this disciplineIngest streams or connect intervals.icu.

Swim pace per 100 m

Session average pace over time. Stroke rate, distance-per-stroke and SWOLF are not in the ingested feed; they need the per-length swim data from the original .fit files.

90100110days since first session in range

Measured. Sessions with corrupt pace excluded — see Data quality.

Bike volume by week

Hours per week, with distance and session count in the tooltip.

05101529/1212/0126/0109/0223/0209/0323/0306/0420/0404/0518/0501/0615/0629/0613/0727/0710/0824/08

Measured.

Bike performance management chart

Needs a per-activity load score.

No TSS for this disciplineIngest streams or connect intervals.icu.

Run volume by week

Hours per week, with distance and session count in the tooltip.

01234529/1212/0126/0109/0223/0209/0323/0306/0420/0404/0518/0501/0615/0629/0613/0727/0710/08

Measured.

Run performance management chart

Needs a per-activity load score.

No TSS for this disciplineIngest streams or connect intervals.icu.

Run cadence

Steps per minute per session. Vertical oscillation, ground contact time and GCT balance require a chest strap or pod that reports run dynamics — they are not present in this data.

155160165170175days since first run in range

Measured.

Mean maximal power

Best average power for every duration from 5 s to 5 h, on a log time axis. This implementation was validated against Strava's own best-effort figures across 13 durations — mean difference 0.12%, worst 0.29%.

No mean-maximal dataNeeds per-activity power or pace streams.

Efficiency factor

Output per heartbeat, tracked over time.

No efficiency-factor dataEF needs normalised power (or graded pace) and heart rate on the same activity.

Aerobic decoupling

Your stated single most important Ironman readiness metric.

No decoupling dataNeeds power (or pace) and HR together on aerobic sessions over 60 minutes. Nothing in the ingested feed carries both.

Fatigue resistance

Power after 1000–2500 kJ versus fresh.

No durability curvesNeeds full power streams from rides long enough to pass 1000 kJ — roughly 75 minutes at your endurance power.

Readiness

HRV, resting heart rate, sleep and body mass with their own baselines.

No wellness data in the storeStrava does not expose HRV, sleep, resting HR or weight at all. intervals.icu does — it syncs them from your Garmin account and is the reason it is the preferred source.
Today: RED
  • Volume over the last 14 days is 57% below the previous 14 (12.6 h vs 29.2 h).
  • ACWR is 0.05 — below 0.8, the detraining range.
  • No HRV, sleep or resting-HR data available, so recovery state cannot be assessed — only training load.

Every line above is a rule you can read and disagree with. There is no composite score.

Race projection — Ironman Busselton

102 days out. Sub-9:00 target.

Model assumptions — all of them, on screen

  • Bike split modelled at 280 W normalised (IF 0.75 against FTP 375 W), the target you set — not a value derived from your data.
  • Speed at that power depends on CdA, wind and rolling resistance, none of which are in this dataset. Busselton is flat, so the dominant unknown is wind, and on the day it can move the bike split by 15–20 minutes in either direction.
  • Run split anchored to your threshold pace of 4:00/km with an Ironman-specific slowdown factor.
  • Swim uses your stated race pace of 1:31/100 m, not a measured CSS — no valid CSS test exists in the data.
  • Transitions assumed at 6 minutes combined.

Why no split table is shown

A projection built on a target power you supplied, a guessed CdA and an assumed swim threshold would tell you what you already believe, dressed up as an output. It would be the prettiest chart here and the least trustworthy. Current CTL: not computable. Once load data is flowing and a CSS test exists, this view models splits from measured durability at 280 W — specifically, your power decay after 2000 kJ, which is roughly where you will be at Busselton's 140 km mark.

Data quality

Run on every sync. These flags decide which numbers on this dashboard you can trust.

SeverityFlagCountWhat it means
Checkno_sensor_data21Manual entry with no device recording. Counted in volume only.
Criticalprobable_duplicate12Same session uploaded twice; the copy has no sensor data. Excluded from every number on this dashboard.
Show the duplicate uploads being excluded
DateDisciplineNameDurationDistance
2026-01-21bikeNight Ride55 min30.0 km
2026-02-18swimMorning Swim5 min0.3 km
2026-03-04bikeNight Ride64 min35.0 km
2026-03-10bikeNight Ride65 min35.0 km
2026-03-17bikeNight ride1 min38.0 km
2026-03-26bikeMorning Ride56 min31.2 km
2026-04-02bikeMorning Ride65 min37.0 km
2026-04-21bikeNight Ride60 min30.0 km
2026-06-09bikeNight Ride68 min36.6 km
2026-06-16bikeNight Ride65 min34.7 km
2026-08-12bikeMorning Ride0 min32.0 km
2026-08-18bikeMorning Ride0 min30.0 km